- • N 14th from Superior to Alvo Rd.

- The overall goal of this project is to strengthen the North 14th Street Corridor while maintaining as little disruption as possible to those who live, work, and travel within this area.
- • S 14th and Warlick

- Information about the new design for the Old Cheney Road-Warlick Blvd.-14th Street intersection area to improve traffic operations and safety.
- • SW 40th Street

- The goals of this project are: to enhance the safety of the public and the railroad, to improve the operation of the area transportation system for its users by eliminating the delay at the BNSF rail crossing through construction of a grade separation over the railroad tracks, and to replace the deficient county bridge over Middle Creek.
- • 56th from Old Cheney to Pine Lake
- Highlights include turn lanes, a new drainage structure, wetland detention cells, a pedestrian under-crossing and median construction
- • 56th from Pine Lake to Yankee Hill
- This project includes reconstruction of 56th Street from Thompson Creek Blvd. through Yankee Hill, and improvements at the intersection of Yankee Hill Road and 56th Street.
- • West 'A' from SW 40th to Coddington
- This project will extend from SW 40th Street to Coddington Ave.
- • East Beltway
- The East Beltway will constitute the east leg of a circumferential freeway system around Lincoln that will be made up of Interstate 80 to the north, the Homestead Expressway (Hwy 77) to the west, and the South Beltway to the south.
- • South Beltway (NDOR)

- The South Beltway will be a new four-lane freeway across the southern suburban area of Lincoln and Lancaster County.
- • West Beltway (NDOR)

- The project involves upgrading existing US-77 to freeway standards from Saltillo Road, north to I-80.
- • S Coddington from W Van Dorn to W 'A'

- The design process for this project is about 60-percent complete. The project will resume when the City can obtain funding for right of way purchases and construction.
- • Pine Lake from 56th to Highway 2
- The roadway will have 4 lanes with turn lanes, a raised median, sidewalks, curbs, and storm sewers.
- • US Hwy. 6 / Sun Valley Boulevard Study

- This project is studying how to provide an efficient roadway, improve traffic operations, resolve existing roadway deficiencies, and accommodate locally adopted plans for US 6 between West 'O' Street and Cornhusker Highway.
City of Lincoln
Public Works and Utilities Projects
Public Works and Utilities Projects